{"id":1646,"date":"2025-09-29T16:31:59","date_gmt":"2025-09-29T16:31:59","guid":{"rendered":"https:\/\/gngrup.com\/en\/?p=1646"},"modified":"2025-09-29T16:31:59","modified_gmt":"2025-09-29T16:31:59","slug":"project-for-the-new-fire-station-in-santanyi","status":"publish","type":"post","link":"https:\/\/gngrup.com\/en\/blog\/2025\/09\/29\/project-for-the-new-fire-station-in-santanyi\/","title":{"rendered":"Project for the new fire station in Santany\u00ed"},"content":{"rendered":"<p>The Consell de Mallorca has awarded GNGRUP the project management contract for the construction of the new fire station in Santany\u00ed.<\/p>\n<p>With a cost of \u20ac5,264,500 and a completion period of twelve months, the new infrastructure will have a permanent staff of one corporal and five firefighters and will reduce response times in the event of a fire or emergency in the northernmost part of the island. In addition, the fire station will be equipped with different types of vehicles: a heavy rural fire engine, a light urban fire engine and an off-road vehicle.<\/p>\n<p>The future Santany\u00ed fire station, covering an area of 1,500 square metres, will have three distinct areas. A main area, on two floors, where the administrative spaces (communications room, office, etc.) and the personal use area (kitchen, dining room, lounge, bedrooms, gym, etc.) will be located. An area for the vehicle fleet, which will include a garage, workshop and general storage areas. It should be noted that the entrance and exit for vehicles will be separate from the main entrance, to avoid interference and allow vehicles to leave quickly in case of emergency. The fire station will also have an area for decontaminating vehicles, which will be located next to the firefighter decontamination area. This will be where firefighters and vehicles enter after an operation and where personal protective equipment and trucks will be disinfected.<\/p>\n<p><a href=\"https:\/\/gngrup.com\/en\/wp-content\/uploads\/sites\/2\/2025\/09\/Parc-de-Bombers-de-Mallorca-Santanyi.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-large wp-image-1647\" src=\"https:\/\/gngrup.com\/en\/wp-content\/uploads\/sites\/2\/2025\/09\/Parc-de-Bombers-de-Mallorca-Santanyi-1024x768.jpg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/gngrup.com\/en\/wp-content\/uploads\/sites\/2\/2025\/09\/Parc-de-Bombers-de-Mallorca-Santanyi-1024x768.jpg 1024w, https:\/\/gngrup.com\/en\/wp-content\/uploads\/sites\/2\/2025\/09\/Parc-de-Bombers-de-Mallorca-Santanyi-300x225.jpg 300w, https:\/\/gngrup.com\/en\/wp-content\/uploads\/sites\/2\/2025\/09\/Parc-de-Bombers-de-Mallorca-Santanyi-768x576.jpg 768w, https:\/\/gngrup.com\/en\/wp-content\/uploads\/sites\/2\/2025\/09\/Parc-de-Bombers-de-Mallorca-Santanyi-150x113.jpg 150w, https:\/\/gngrup.com\/en\/wp-content\/uploads\/sites\/2\/2025\/09\/Parc-de-Bombers-de-Mallorca-Santanyi-640x480.jpg 640w, https:\/\/gngrup.com\/en\/wp-content\/uploads\/sites\/2\/2025\/09\/Parc-de-Bombers-de-Mallorca-Santanyi.jpg 1217w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Consell de Mallorca has awarded GNGRUP the project management contract for the construction of the new fire station in Santany\u00ed. With a cost of \u20ac5,264,500 and a completion period of twelve months, the new infrastructure will have a permanent staff of one corporal and five firefighters and will reduce response times in the event [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":1647,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Project for the new fire station in Santany\u00ed - EN<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/gngrup.com\/en\/blog\/2025\/09\/29\/project-for-the-new-fire-station-in-santanyi\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project for the new fire station in Santany\u00ed - EN\" \/>\n<meta property=\"og:description\" content=\"The Consell de Mallorca has awarded GNGRUP the project management contract for the construction of the new fire station in Santany\u00ed. With a cost of \u20ac5,264,500 and a completion period of twelve months, the new infrastructure will have a permanent staff of one corporal and five firefighters and will reduce response times in the event [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/gngrup.com\/en\/blog\/2025\/09\/29\/project-for-the-new-fire-station-in-santanyi\/\" \/>\n<meta property=\"og:site_name\" content=\"EN\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-29T16:31:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/gngrup.com\/en\/wp-content\/uploads\/sites\/2\/2025\/09\/Parc-de-Bombers-de-Mallorca-Santanyi.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1217\" \/>\n\t<meta property=\"og:image:height\" content=\"913\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"gngrup\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"gngrup\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/gngrup.com\/en\/blog\/2025\/09\/29\/project-for-the-new-fire-station-in-santanyi\/\",\"url\":\"https:\/\/gngrup.com\/en\/blog\/2025\/09\/29\/project-for-the-new-fire-station-in-santanyi\/\",\"name\":\"Project for the new fire station in Santany\u00ed - EN\",\"isPartOf\":{\"@id\":\"https:\/\/gngrup.com\/en\/#website\"},\"datePublished\":\"2025-09-29T16:31:59+00:00\",\"dateModified\":\"2025-09-29T16:31:59+00:00\",\"author\":{\"@id\":\"https:\/\/gngrup.com\/en\/#\/schema\/person\/62af7a7965e07d9536947a83662c4d36\"},\"breadcrumb\":{\"@id\":\"https:\/\/gngrup.com\/en\/blog\/2025\/09\/29\/project-for-the-new-fire-station-in-santanyi\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/gngrup.com\/en\/blog\/2025\/09\/29\/project-for-the-new-fire-station-in-santanyi\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/gngrup.com\/en\/blog\/2025\/09\/29\/project-for-the-new-fire-station-in-santanyi\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/gngrup.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project for the new fire station in Santany\u00ed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/gngrup.com\/en\/#website\",\"url\":\"https:\/\/gngrup.com\/en\/\",\"name\":\"EN\",\"description\":\"Just another WordPress site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/gngrup.com\/en\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/gngrup.com\/en\/#\/schema\/person\/62af7a7965e07d9536947a83662c4d36\",\"name\":\"gngrup\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/gngrup.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/456d8346073d8d1a0b68f84f7d5a0297?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/456d8346073d8d1a0b68f84f7d5a0297?s=96&d=mm&r=g\",\"caption\":\"gngrup\"},\"url\":\"https:\/\/gngrup.com\/en\/blog\/author\/gngrup\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Project for the new fire station in Santany\u00ed - EN","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/gngrup.com\/en\/blog\/2025\/09\/29\/project-for-the-new-fire-station-in-santanyi\/","og_locale":"en_GB","og_type":"article","og_title":"Project for the new fire station in Santany\u00ed - EN","og_description":"The Consell de Mallorca has awarded GNGRUP the project management contract for the construction of the new fire station in Santany\u00ed. With a cost of \u20ac5,264,500 and a completion period of twelve months, the new infrastructure will have a permanent staff of one corporal and five firefighters and will reduce response times in the event [&hellip;]","og_url":"https:\/\/gngrup.com\/en\/blog\/2025\/09\/29\/project-for-the-new-fire-station-in-santanyi\/","og_site_name":"EN","article_published_time":"2025-09-29T16:31:59+00:00","og_image":[{"width":1217,"height":913,"url":"https:\/\/gngrup.com\/en\/wp-content\/uploads\/sites\/2\/2025\/09\/Parc-de-Bombers-de-Mallorca-Santanyi.jpg","type":"image\/jpeg"}],"author":"gngrup","twitter_card":"summary_large_image","twitter_misc":{"Written by":"gngrup","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/gngrup.com\/en\/blog\/2025\/09\/29\/project-for-the-new-fire-station-in-santanyi\/","url":"https:\/\/gngrup.com\/en\/blog\/2025\/09\/29\/project-for-the-new-fire-station-in-santanyi\/","name":"Project for the new fire station in Santany\u00ed - EN","isPartOf":{"@id":"https:\/\/gngrup.com\/en\/#website"},"datePublished":"2025-09-29T16:31:59+00:00","dateModified":"2025-09-29T16:31:59+00:00","author":{"@id":"https:\/\/gngrup.com\/en\/#\/schema\/person\/62af7a7965e07d9536947a83662c4d36"},"breadcrumb":{"@id":"https:\/\/gngrup.com\/en\/blog\/2025\/09\/29\/project-for-the-new-fire-station-in-santanyi\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/gngrup.com\/en\/blog\/2025\/09\/29\/project-for-the-new-fire-station-in-santanyi\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/gngrup.com\/en\/blog\/2025\/09\/29\/project-for-the-new-fire-station-in-santanyi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/gngrup.com\/en\/"},{"@type":"ListItem","position":2,"name":"Project for the new fire station in Santany\u00ed"}]},{"@type":"WebSite","@id":"https:\/\/gngrup.com\/en\/#website","url":"https:\/\/gngrup.com\/en\/","name":"EN","description":"Just another WordPress site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/gngrup.com\/en\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/gngrup.com\/en\/#\/schema\/person\/62af7a7965e07d9536947a83662c4d36","name":"gngrup","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/gngrup.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/456d8346073d8d1a0b68f84f7d5a0297?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/456d8346073d8d1a0b68f84f7d5a0297?s=96&d=mm&r=g","caption":"gngrup"},"url":"https:\/\/gngrup.com\/en\/blog\/author\/gngrup\/"}]}},"_links":{"self":[{"href":"https:\/\/gngrup.com\/en\/wp-json\/wp\/v2\/posts\/1646"}],"collection":[{"href":"https:\/\/gngrup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gngrup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gngrup.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/gngrup.com\/en\/wp-json\/wp\/v2\/comments?post=1646"}],"version-history":[{"count":1,"href":"https:\/\/gngrup.com\/en\/wp-json\/wp\/v2\/posts\/1646\/revisions"}],"predecessor-version":[{"id":1648,"href":"https:\/\/gngrup.com\/en\/wp-json\/wp\/v2\/posts\/1646\/revisions\/1648"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gngrup.com\/en\/wp-json\/wp\/v2\/media\/1647"}],"wp:attachment":[{"href":"https:\/\/gngrup.com\/en\/wp-json\/wp\/v2\/media?parent=1646"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gngrup.com\/en\/wp-json\/wp\/v2\/categories?post=1646"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gngrup.com\/en\/wp-json\/wp\/v2\/tags?post=1646"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}